CHAPTER 160: STORMWATER MANAGEMENT
Section
Purpose and Definitions
160.001    Purposes of this chapter
160.002    Definitions
Requirements for Stormwater Management
General Information
160.010    Other applicable sections
160.011    Applicability of site runoff storage requirements (detention)
160.012    Exemptions from site runoff storage requirements (detention)
General Stormwater Requirements
160.013    Requirements applicable to all development
160.014    Requirements applicable to all subdivisions and commercial developments
160.015    Building permits
160.016    Single parcel developments
160.017    Overland flow paths
160.018    Protection of buildings
160.019    Depressional storage
Site Runoff Requirements
160.020    Stormwater facility discharges
160.021    Minor stormwater system criteria
160.022    Major stormwater system criteria
160.023    Existing sub-surface and surface drainage systems
160.024    Design runoff rate
160.025    Design rainfall
160.026    Stormwater systems easements
160.027    Flow depths
160.028    Diversion of flow to another watershed
160.029    Best management practices requirements
Site Runoff Storage Requirements (Detention/Extended Detention)
160.030    Release rate
160.031    Design methods
160.032    Existing release rate less than allowable
160.033    Downstream water surface elevations
160.034    Extended detention requirement
160.035    Site runoff storage facility design requirements
160.036    Site runoff storage facility requirements within the regulatory floodplain
160.037    Site runoff storage facility requirements within the regulatory floodway
160.038    Off-site facilities
160.039    Cross-stream structures for site runoff storage facilities
Stormwater Requirements for Agricultural Land Use Including Croplands, Pasture Lands, and Farmsteads
160.040    Applicability
160.041    Conservation planning and performance standards
160.042    Drainage practices, requirements and design criteria
160.043    Sediment control for open channels
160.044    Maintenance and construction of drainage systems
Sediment and Erosion Control
160.055    Site planning
160.056    Standards and specifications
160.057    General requirements
160.058    Extended construction shutdown periods
160.059    Hydraulic and hydrologic design requirements
160.060    "As-needed" practices on the plans
160.061    Sediment and erosion control plan requirements
160.062    Conveyance of off-site flow
160.063    Stockpiles
160.064    Storm sewer inlets
160.065    Construction dewatering
160.066    Protection of public/private roadways
160.067    Temporary stream crossings
160.068    Inspections
Protection of Special Management Areas
160.080    Floodplains and floodways
160.081    Floodplain, regulatory floodplain, base flood elevation (BFE) and regulatory floodway locations
160.082    General performance standards
160.083    Compensatory storage volume standards
160.084    Floodway standards
160.085    Riverine floodplain
160.086    Bridge and culvert standards
Stream and Wetlands Protection
160.087    Authority
160.088    Title
160.089    Purpose and intent
160.090    Site development permit
160.091    General provisions: area affected
160.092    Watercourse relocation and minor modifications (including channelization and relocation)
160.093    Impact assessment
160.094    Stream maintenance easement
160.095    Threatened and endangered species
160.096    Security
160.097    Liability
160.098    Separability
160.099    Retroactivity
160.100    Enforcement
Stormwater Management Permit Submittal Requirements
General Requirements
160.110    Stormwater management and other permits required
160.111    Permit review fees
160.112    Professional seals and certifications required
Duration and Revision to Permits
160.113    Permit expiration
160.114    Permit extension
160.115    Permit revision
Required Submittals
160.116    Generally
160.117    Modification of submittal requirements
160.118    Applications and project overview
160.119    Plan set submittal
160.120    Stormwater submittal
160.121    Floodplain submittal
Submittal Prior to Permit Issuance
160.122    Additional submittals required
160.123    Performance security
160.124    Maintenance schedule and funding
160.125    Record drawings
160.126    Issuance or denial of permit and appeal of permit denial
Long-Term Maintenance
160.135    Long-term maintenance
160.136    Transfer to permitting authority or other public entity
160.137    Transfer to homeowner's or similar association
160.138    Conveyance to one or more persons
160.139    Incorporation of maintenance obligations in stormwater management permit
160.140    Funding of long-term maintenance of stormwater facilities
Enforcement and Penalties
160.150    Inspection and maintenance authority
160.151    Required inspections
160.152    Offenses
160.153    Offenses; penalties: remedies
160.154    Violations of §§ 160.040 through 160.044
General Provisions
160.165    Scope of regulation
160.166    Exemptions
160.167    Community's list of proposed exempt developments
160.168    Interpretation
160.169    Warning and disclaimer of liability
160.170    Violations
160.171    Severability
160.172    Repealer
160.173    Effective date
Variances
160.185    Purpose
160.186    Application for variances
160.187    Application fee
160.188    Public hearing
160.189    Granting of variances
160.190    Recommendations
160.191    Decision
160.192    Conditions
Administration
160.200    Responsibility for administration
160.201    Duties of Director
160.202    Duties of Administrator
160.203    Representative capacity
160.204    Oversight Committee
160.205    Service
160.206    Publication
Performance Security
160.215    General security requirements
160.216    Development security
160.217    Sediment and erosion control security
160.218    Letters of credit
Fee-in-lieu of On-Site Detention
160.225    Fee-in-lieu of on-site detention
Appendix A.    Table 1. Will County Stormwater Technical Guidance Manual Rainfall Depths and Intensities.
Appendix B.    Table 2. Summary of Applicable Chapter Sections for Developments in Floodplains
Appendix C.    Table 3. Permit Submittal Requirements
Appendix D.    Table 4. Village of Romeoville List of Proposed Exempt Developments
Appendix E.    Figure 1. Detention Volume vs. Percent Impervious Will County Rainfall
Appendix F.    Flood Insurance Study (FIS) and Flood Insurance Rate Map (FIRM) Panels